• Easy to handle and apply
• Extremely durable and resistant to wear
• Fast setting – can be driven over within 20-30 minutes (at 20° C)
For attaching to surface if high shear loads are expected.
Despatch time approx. 10/15 working days.
• Easily installed
• Effective speed reduction
• Surface tread ensures grip – even when wet
• Easily adjusts to site conditions
• Suitable for HGV’s
Despatch time approx. 1/2 working days
• Easily installed
• Effective speed reduction
• Surface tread ensures grip – even when wet
• Easily adjusts to site conditions
• Suitable for HGV’s
Despatch time approx. 1/2 working days
All you need for a complete ramp kit including Rawl bolts (4 per guard).
You still need to add the reinforcing rod 280.10.230 sold per meter.
Delivery approx. 1-2 working days.
Height 50mm for speeds up to 10mph
All you need for a complete ramp kit including Rawl bolts (4 per guard).
You still need to add the reinforcing rod 280.10.230 sold per meter.
Delivery approx. 1-2 working days.
Height 70mm for speeds up to 5mph.
• Easily installed
• Effective speed reduction
• Surface tread ensures grip – even when wet
• Easily adjusts to site conditions
• Suitable for HGV’s
Despatch time approx. 1/2 working days
• Easily installed
• Effective speed reduction
• Surface tread ensures grip – even when wet
• Easily adjusts to site conditions
• Suitable for HGV’s
Despatch time approx. 1/2 working days
• Easily & Quickly deployed
• 2 top loading channels
• Interlocking design
• Protective yellow lid
• Suitable for traffic up to HGV’s
Despatch time approx. 1/2 working days
• Quickly and easily deployed
• Interlocking design feature
• Strong robust construction
• Anti-slip hinged top cover
Despatch time approx. 1/2 working days (Cross-Over section 10/15 working days)
We recommend that appropriate warning signs are used with this product.
• Easily and quickly deployed
• 5 top loading channels for cables/hoses
• Interlocking design feature
• With protective lid and carrying handle
• Suitable for traffic up to HGV’s (Max. axle load 8t)
Despatch time approx. 10/15 Working days.
• Easy and quick to deploy
• Tough flexible materials
• High visibility with alternating Black/Yellow sections
• Protect cables/hoses up to 40mm Ø
Despatch time approx. 1/2 working days.
• Manufactured from rubber.
• Easily cut to length.
• Ideal for roads and construction sites.
• Cost effective.
Despatch time approx. 1/2 working days.
We use cookies to provide necessary website functionality, improve your experience and analyze our traffic. By using our website, you agree to our Privacy Policy and our cookies usage.