• Easy to handle and apply
• Extremely durable and resistant to wear
• Fast setting – can be driven over within 20-30 minutes (at 20° C)
For attaching to surface if high shear loads are expected.
Despatch time approx. 10/15 working days.
• For Indoor and Outdoor use
• High quality steel
• Heavy duty protection
• Surface or sub-surface installation options
• Thick wall gauge
• High visibility markings
Despatch times:- Yellow/Black 1/2 working days, White/Red 5/10 working days.
• For Indoor use only
• High quality steel
• Easily and quickly installed
• Low profile design
• Highly visible yellow and black marking
despatch time approx. 1/2 working days, Corner bar 10/15 working days.
• For indoor use
• Protects the floor
• Heavy-duty barrier
• High energy absorption
• TUV-tested according to DGUV 108-007
Despatch time approx. 10/15 working days.
• For Indoor (Powder Coated) and Outdoor use (Hot dip galvanised and powder coated)
• High quality steel
• Shock absorbing features
• UV and temperature resistant pads
• Highly visible yellow and black marking
• TUV-tested according to DGUV 108-007
despatch time Approx. 10/15 working days.
• For Indoor (Powder Coated) and Outdoor use (Hot dip galvanised and powder coated)
• High quality steel
• High impact resistance
• Highly visible yellow/black markings
• Easily installed
• TUV-tested according to DGUV 108-007
Despatch time approx. 10/15 working days
• Indoor use
• High quality steel
• Strong ‘C’ section rails
• Quickly and easily installed
• Adjusts to all frame widths
• TUV-tested according to DGUV 108-007
Despatch time approx. 10/15 working days.
• Indoor use only
• Excellent image quality
• Easy & quick installation
• Light construction
• Helps reduce accidents & theft
• 2 year guarantee against manufacturing faults
Despatch time approx. 1/2 working days.
• Manufactured in high quality steel
• Surface or sub-surface fixing options
• Retro-reflective bands
• Cost effective
Despatch time 10/15 working days
Optimal all-round protection of charging units, posts, lamp-posts etc. against collision damage.
Two-part tubular steel construction
Despatch time 5/10 working days
• Quickly & easily deployed
• Corrosion proof plastic construction
• Low centre of gravity for stability
• Highly visible post colours – red/white or black/yellow
Choice of 3 base types:
Plastic, concrete filled (Three sided)
Plastic Hollow (Round)
Hard rubber (Four sided)
Despatch time approx. 1/2 two working days.
We use cookies to provide necessary website functionality, improve your experience and analyze our traffic. By using our website, you agree to our Privacy Policy and our cookies usage.